SmugMug
Home | Login | Help |
 
|View Cart
rainfreshharvests  > Business > RainFresh Harvests -- Case study for Bio-Integrated Greenhouse
Gallery pages:  <  1  2  3  4  >  
 Articulated cantilever boom for installation
Articulated cantilever boom for installation
 Sun setting, last panels installed after dark
Sun setting, last panels installed after dark
 Panels installed Mar 2005
Panels installed Mar 2005
Bergey 1.0kW wind turbine.  Precision adjustment of blades before raising tower
Bergey 1.0kW wind turbine. Precision adjustment of blades before raising tower
Attaching the gin pole
Attaching the gin pole
Portable battery operated winch and pulleys to raise tower
Portable battery operated winch and pulleys to raise tower
Raising the 80 ft tower and turbine
Raising the 80 ft tower and turbine
Still going up
Still going up
Bergey wind turbine installation was completed April 7 2005
Bergey wind turbine installation was completed April 7 2005
 Greenhouse plants Aug 2005
Greenhouse plants Aug 2005
Gallery pages:  <  1  2  3  4  >  

Gallery Comments

| hide gallery comments |

New comment: Requires approval

Name: Email: Link:
Connect  Connect with Facebook


Rating: stars
To foil spammers, enter this code: copy this text in this box: Code unreadable?



News | Browse | Keywords | Communities | Forum | Wiki | ClubSmug | Prints & Gifts | Shopping Cart | Login
Terms | Privacy | About Us | Contact SmugMug | Blogs | API | Affiliates | © 2009 SmugMug, Inc.
Show FeedsAvailable Feeds | What are feeds?
Gallery Photos:
Atom FeedAtom | RSS FeedRSS
Comments | Info | Keywords

| hide gallery comments

New comment: Requires approval

Name: 
Email: 
Link: 
Connect  Connect with Facebook


Rating: stars
To foil spammers, enter this code: copy this text in this box: Code unreadable?